Référence de projet

 11-0226-091-MKD-techsupTAIB

Durée de l'engagement

 2016 - 2017

Budget

71,000

Pays

 Macédoine du Nord

Mots-clés

 Environment, Information technology, PCM / Logframe

Preparation of Technical Specification for TAIB 2012 Supply Contract for supply of appropriate equipment to exchange and manage information and monitoring for water, waste, air management, nature and climate change

The project objective was to further approximate and implement the environmental acquisition, through strengthening the administrative capacities for environmental management on central and local level in the fields of water management, waste management, nature protection, air management and climate change.
The specific objective of this assignment was to assist the Beneficiary institution – MoEPP with the preparation of Technical Specification for TAIB 2012 Supply Contract for appropriate equipment to exchange and manage information and monitoring for water, waste, air management, nature and climate change.

Partenaires

 Particip (Lead), ETI, Ramboll Deutschland